Aleksandar Obradovic

Flood damage to EPS yet to be precisely assessed

BELGRADE - The damage that the severe floods caused to the Serbian electric power system has yet to be precisely assessed, as this would be possible after coal mines are completely dried and mud removed, Acting Director General of the public enterprise Electric Power Industry of Serbia (EPS) Aleksandar Obradovic said on Wednesday.

Pages