Tunnel

Engineering and Construction Contract Signed for 1.4 km of Struma Motorway

Sofia. The Road Infrastructure Agency announced the signing of the engineering and construction contract for 1.4 km of Struma motorway after the tunnel of Zheleznitsa in the direction of Krupnik. The contract is worth BGN 22.1 million. PST Group has 120 days to draft the project and 480 days for construction.

The Government Approved a Tunnel Project Under Petrohan and a Speed Road to Vidin

The Cabinet adopted today the draft decision to build a speed road to Vidin and a tunnel under Petrohan.

A design study will be carried out to build the tunnel for which the state is preparing for a concession. They are looking also for an investor, reported the Bulgarian National Television. 

 

Pages