Kozloduy Nuclear Power Plant
Bulgaria Started Construction of a National Repository for Low- and Intermediate-Level Radioactive Waste
Bulgaria started construction of a national repository for low- and intermediate-level radioactive waste yesterday, marking the occasion with a ceremony. The repository is being built at the Radiana site, close to the Kozloduy nuclear power plant.
Construction of National Storage Facility for Radioactive Waste Will Begin Today
Energy Minister Temenujka Petkova will start construction of the National Storage Facility for Low- and Medium-Radioactive Waste, reported BGNES.
The project is implemented by the State Enterprise "Radioactive Waste" with funds from the Kozloduy International Fund through the European Bank for Reconstruction and Development.
The Construction of the National Radioactive Waste Repository Begins
Energy Minister Temenujka Petkova will signal the start of the construction of the National Storage Facility for Low- and Medium-Radioactive Waste, the Energy Authority reports.
Bulgaria Needs New Nuclear Reactor Soon
Bulgaria should start developing new nuclear capacities as soon as possible, or else the country's energy security will be put at risk," said Aleksandar Nikolov, former NPP Kozloduy CEO and member of the Institute for Nuclear Research and Nuclear Energy with the Bulgarian Academy of Sciences, according to Standart News.
- Read more about Bulgaria Needs New Nuclear Reactor Soon
- Log in to post comments
Bulgarian Minister of Energy: 'Energy Sector Needed Sustainability and Predictability'
''The main priorities of the Bulgarian energy sector are currently guaranteeing energy security, liberalizing the gas and energy markets, extending the life of Units 5 and 6 of Kozloduy NPP and finding a solution for the project for a second nuclear power plant in Belene.''
This is what Bulgarian Minister of Energy Temenuzhka Petkova has said, according to BGNES.
Bulgaria's Nuclear Regulatory Agency Plans to use EUR 3 million in Funding From the European Bank for Reconstruction and Development
Bulgaria's nuclear regulatory agency (BNRA) plans to use EUR 3 million (USD 3.42 million) in funding from the European Bank for Reconstruction and Development for its role in the decommissioning of units 1-4 of the Kozloduy nuclear power plant.
The Fifth Block of Kozloduy NPP Is Stopped Because of Planned Modernization
The fifth block of Kozloduy Nuclear Power Plant (NPP) in Bulgaria is currently stopped because of the planned yearly renovation and modernization, reported BNR.
Reshuffles in Bulgaria's Energy Ventures
The Bulgarian Energy Holding (BEH) has embarked on massive overhauls in the management of key state-owned energy companies.
The (BEH), an entity representing and managing state-owned assets in energy, has removed Jacklen Cohen as chair of the board of the Kozloduy Nuclear Power Plant (NPP).
- Read more about Reshuffles in Bulgaria's Energy Ventures
- Log in to post comments
Restrictions on Electricity Sales by Kozloduy NPP, Maritsa Iztok, NEK Lifted
The restrictions on the quantities of electricity which state enterprises Kozloduy NPP, Maritsa Iztok 2 and National Electricity Company (NEK) may sell on the Bulgarian Energy Exchange have been lifted.
License for Kozloduy's Fifth Unit To Be Issued by September
The Bulgarian Nuclear Regulatory Agency is expected to complete the evaluation of the documentation and issue a license for the Fifth Unit of the Kozloduy NPP by September 2017, which will allow the unit to operate for another ten years, announced the chairman of the nuclear regulator Latchesar Kostov.