San Foca

No rerouting Trans Adriatic Pipeline, says its president

The Trans Adriatic Pipeline (TAP) taking gas from Azerbaijan to Europe will pump the first gas into Italy at the start of 2020 despite local protests against the 4.5-billion-euro project, TAP's president told Reuters.

"We are on track to deliver the gas in the first quarter of 2020," Walter Peeraer said in an interview.